PLATFORM RECERTIFICATION

Project

OPERATOR – REPSOL YPF Maxus

Project Description

The company has a number if platforms which has exceeded the design life. The company needs to keep these platforms operative, in some cases with enhancement for additional output. A structural integrity audit was to be carried out on these platforms for third party certification.

ZEE’s Scope of Work


  • Carry out structural survey to establish “as it is” state,
  • Build accurate model,
  • Carry out standard analysis,
  • If failure was encountered carry out push-over analysis to establish the reserve strength,
  • Carry out fatigue analysis,
  • If required carry out remedial engineering to make the platform fit for use,
  • Lease with Certifying Authorities.

Policy Statement

We commit to apply quality management system ISO 9001:2008 and established quality policy as follows:

To comply client requirements and to increase client satisfactory

To produce quality engineering services at competitive rates

To improve the quality of our human resources

Make continuous improvements of the processes, products, services and effective implementation of the quality management system.

Zee Indonesia

ZEE ENGINEERING (ZEE) was established in 1986 to provide engineering services to the Oil/Gas Industry in Indonesia as well as South East Asia.