PERTAMINA LIMA DECK RAISING PROJECT

Project

OPERATOR – Pertamina (Indonsia)
EPPC CONTRACTOR – TIMAS

Project Description

Lima Filed Assets are approximately 30 years old. Due to the heavy extraction of Oil/Gas the complete field has subsided approximately 12 meters. PERTAMINA wishes to prolog the production life of the field and decide to carry out the lifting of the 4 platforms in the field simultaneously. This is the first time such a project has been undertaken.

Scope included the relocation of existing equipment, modify all piping and E&I works, Structural re-analysis and structural modification. The complete project was undertaken by Synergy / ZEE (JV Partners)

ZEE’s Scope of Work


  • Structural modifications and re-analysis,
  • Structural Integrity of the Hydraulic Jacking System,
  • Local F.E. Analysis

Policy Statement

We commit to apply quality management system ISO 9001:2008 and established quality policy as follows:

To comply client requirements and to increase client satisfactory

To produce quality engineering services at competitive rates

To improve the quality of our human resources

Make continuous improvements of the processes, products, services and effective implementation of the quality management system.

Zee Indonesia

ZEE ENGINEERING (ZEE) was established in 1986 to provide engineering services to the Oil/Gas Industry in Indonesia as well as South East Asia.