HOT TAP PROJECT

Project

OPERATOR – PHE ONWJ

Project Description

The existing 24-inch MGL APNA-MMC was locally damaged at around subsea tee location from APND Platform due to dragged anchor. PHEONWJ intends to repair this local damage pipeline by using Hot Tap method in order to maintain continuous gas supply from APN to MIKE-MIKE.

Policy Statement

We commit to apply quality management system ISO 9001:2008 and established quality policy as follows:

To comply client requirements and to increase client satisfactory

To produce quality engineering services at competitive rates

To improve the quality of our human resources

Make continuous improvements of the processes, products, services and effective implementation of the quality management system.

Zee Indonesia

ZEE ENGINEERING (ZEE) was established in 1986 to provide engineering services to the Oil/Gas Industry in Indonesia as well as South East Asia.