HEERA REDEVELOPMENT PROJECT

Project

OPERATOR – ONGC (India)
EPCC CONTRACTOR – Punj Lloyd (India)

Project Description

Heera Redevelopment project included the installation of 4 new Well-Head Platforms, 8 new Rigid Pipelines, 3 Flexi lines, 3 cables and modification to 7 existing platforms.

The project was executed via Sempec/ZEE office in Jakarta and the fabrication of the Platforms were carried in Kencana Yard in Lumut, Malaysia.

ZEE’s Scope of Work


  • Design of the 4 new platforms,
  • Modification of 7 existing platforms,
  • Design of 8 rigid pipelines,
  • Design of 3 flexi lines,
  • Design of 3 cables,
  • Construction supervision at Malaysian Yard,
  • Transport and Installation Engineering.

Policy Statement

We commit to apply quality management system ISO 9001:2008 and established quality policy as follows:

To comply client requirements and to increase client satisfactory

To produce quality engineering services at competitive rates

To improve the quality of our human resources

Make continuous improvements of the processes, products, services and effective implementation of the quality management system.

Zee Indonesia

ZEE ENGINEERING (ZEE) was established in 1986 to provide engineering services to the Oil/Gas Industry in Indonesia as well as South East Asia.