Project

HOT TAP PROJECT


OPERATOR – PHE ONWJ

Project Description

The existing 24-inch MGL APNA-MMC was locally damaged at around subsea tee location from APND Platform due to dragged anchor. PHEONWJ intends to repair this local damage pipeline by using Hot Tap method in order to maintain continuous gas supply from APN to MIKE-MIKE.


...