OPERATOR – ARCO (Indonesia)
ARCO Was looking into ways of reducing pipeline installation costs specially for infield short lengths. In LL4A project ZEE proposed the Rentis Method. A pipeline bundle 8” & 4” was assembled on-shore. The length of the bundle was 2.1 km. The bundled was towed 65 km offshore and installed between 2 platforms.