Project

HEERA REDEVELOPMENT PROJECT


OPERATOR – ONGC (India)
EPCC CONTRACTOR – Punj Lloyd (India)

Project Description

Heera Redevelopment project included the installation of 4 new Well-Head Platforms, 8 new Rigid Pipelines, 3 Flexi lines, 3 cables and modification to 7 existing platforms.

The project was executed via Sempec/ZEE office in Jakarta and the fabrication of the Platforms were carried in Kencana Yard in Lumut, Malaysia.


...
...

ZEE’s Scope of Work


  • Design of the 4 new platforms,
  • Modification of 7 existing platforms,
  • Design of 8 rigid pipelines,
  • Design of 3 flexi lines,
  • Design of 3 cables,
  • Construction supervision at Malaysian Yard,
  • Transport and Installation Engineering.